All updates

Swiss East Possession Is Near

Following the landmark delivery of plot possession in Swiss Executive 30 months ahead of schedule, Royal Swiss Housing has released a new 32-second site update confirming that Swiss East possession delivery is coming soon, with heavy compaction machinery, underground utility crews, and road formation operating at full pace.

Official drone and on-ground construction film from Swiss East: Road compaction, water bowser grading, concrete works, and Main Boulevard connectivity ahead of upcoming plot possession delivery. (00:32)Open main poster

Possession Delivery Coming Soon: Inside the Swiss East Site Film

The official 32-second ‘Swiss East: Possession Coming Soon’ video captures active horizontal infrastructure across the entire Swiss East sector at Royal Swiss Housing on Main Bahawalpur Road near the Motorway Interchange, Multan.

With primary plot grids demarcated and street corridors leveled, engineering teams are now executing the final pre-asphalt and utility stages required to hand over physical plot possession to Swiss East members.

  • 00:00 – 00:07 (Sector-Wide Road Grid & Compaction): Wide drone sweep across the demarcated Swiss East street network as heavy vibratory rollers compact the sub-base with the multi-storey overhead water tank standing on the horizon.
  • 00:08 – 00:14 (Water Bowser Grading & Moisture Conditioning): Tractor-drawn water bowsers spraying and conditioning the roadbed alongside staged RCC sewerage pipes.
  • 00:15 – 00:22 (Concrete Works & Precast Boundary Enclosure): On-ground masonry and concrete mixer crews completing utility chambers and structural works along the secured perimeter boundary wall.
  • 00:23 – 00:32 (Main Boulevard & Monument Arches Approach): Aerial flyover of the fully carpeted dual carriageway Main Boulevard, signature golden entrance arches, and manicured greenbelts leading straight into the sector.

Building on the Momentum of Swiss Executive

After handing over plot possession in Swiss Executive 30 months ahead of the committed deadline and opening formal plot registry, Habib Rafiq (Pvt.) Ltd. (HRL) and Royal Swiss Housing immediately mobilized earthmoving and civil engineering fleets into Swiss East.

Every road corridor, underground sewerage line, water supply network, and park space in Swiss East is being developed to the same benchmark standard already visible across Swiss Executive.

How Swiss East Members Can Prepare for Possession Handover

  • Keep your Swiss East plot installment ledger up to date so your file qualifies immediately when the formal possession handover window opens.
  • Ensure your booking, allocation, and CNIC contact records are current with the Royal Swiss Housing Transfer & Record office.
  • Visit the site on Main Bahawalpur Road, Multan, or contact official HRL Housing support to review on-ground progress in your street block.

Source gallery

More from this update

References & next steps

Useful links