397 MW CC Power Plant (Unit 13, 14, 15), a Power & Energy project delivered by Habib Rafiq (Pvt.) Ltd.

397 MW CC Power Plant (Unit 13, 14, 15)

Kot Addu, Distt. Muzaffargarh

Power & Energy

Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.

ALL POWER & ENERGY
Location
Kot Addu, Distt. Muzaffargarh
Client
WAPDA
Main Contractor
Siemens Ag, As Consortium Partner
Contract Value
US$ 96 Million

Scope

Scope of Work

  • Design & Construction Of Gas Turbine House, Control Room Buildings, Steam Turbine Building
  • Cooling Towers, Water Treatment Plant, Ancillary Structure, Water Intake Structure, Drainage System And Asphalt Roads
  • Total Concrete Batched And Placed = 100,000 M3
  • Steel Structure Fabricated And Erected = 3000 Tons
  • Erection Of Gas & Steam Turbine

Discuss a project with HRL.

Six decades of engineering delivery across power, infrastructure, buildings and housing.