Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.
ALL POWER & ENERGY →- Location
- Balloki
- Client
- National Power Parks Management Co. Pvt. Ltd
- Main Contractor
- HEI-HRL joint venture.
- Contract Value
- US$ 562 million
Scope
Scope of Work
- Complete Civil Works of Project including Gas Turbines, Generators, Steam Turbines, Water Cooled Condensers, Cooling System fed from Canal Water, Cooling Towers, HRSG
- Construction of Primary Fuel System (RLNG) & Secondary Fuel System (HSD), 500 kV switchyard, Step-up Transformers, Balance of Plant (BOP) equipment
- Temporary facilities, Electric Power & Water Supplies, Fencing, Distribution, Office Accommodation, Plant & Access Roads, Storm Water Drainage, Sewerage, Portable Water, Boundary Wall
- Auxiliary, Electrical, Fire Fighting & Fire Alarm Systems, CEMS, CCTV, Control & Instrumentation Systems
- Concrete: 95,000m³ Steel Reinforcement: 10,500 Ton
- Earthwork: 275,000 M³
- Piles (760mm dia, 25 m Length): 1550 No