1223 MW RLNG combined cycle power plant (EPC), a Power & Energy project delivered by Habib Rafiq (Pvt.) Ltd.

1223 MW RLNG combined cycle power plant (EPC)

Balloki

Power & Energy

Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.

ALL POWER & ENERGY →
Location
Balloki
Client
National Power Parks Management Co. Pvt. Ltd
Main Contractor
HEI-HRL joint venture.
Contract Value
US$ 562 million

Scope

Scope of Work

  • Complete Civil Works of Project including Gas Turbines, Generators, Steam Turbines, Water Cooled Condensers, Cooling System fed from Canal Water, Cooling Towers, HRSG
  • Construction of Primary Fuel System (RLNG) & Secondary Fuel System (HSD), 500 kV switchyard, Step-up Transformers, Balance of Plant (BOP) equipment
  • Temporary facilities, Electric Power & Water Supplies, Fencing, Distribution, Office Accommodation, Plant & Access Roads, Storm Water Drainage, Sewerage, Portable Water, Boundary Wall
  • Auxiliary, Electrical, Fire Fighting & Fire Alarm Systems, CEMS, CCTV, Control & Instrumentation Systems
  • Concrete: 95,000m³ Steel Reinforcement: 10,500 Ton
  • Earthwork: 275,000 M³
  • Piles (760mm dia, 25 m Length): 1550 No

Source & verification

Documented from the official engineering portfolio.

The project name, location, client, contractor, contract value, covered area, and scope shown here are compiled from Habib Rafiq's published engineering record. This archive describes delivered portfolio work; it does not imply a current project status, open procurement, or investment offer. Request current documentation from HRL before relying on a record for commercial decisions.

VIEW SOURCE PORTFOLIO →

Discuss a project with HRL.

Six decades of engineering delivery across power, infrastructure, buildings and housing.