
2×660 MW coal-fired power plant
Bin Qasim Karachi
Power & Energy
Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.
ALL POWER & ENERGY →- Location
- Bin Qasim Karachi
- Client
- Power China
- Main Contractor
- SEPCO-III.
- Contract Value
- US$ 50 million
Scope
Scope of Work
- Gravel Filling in Plant Area
- Construction of Batching Plant Area
- Temporary Facilities
- Drainage Works
- Plant Roads
- Industrial Waste Water Storage Basin
Discuss a project with HRL.
Six decades of engineering delivery across power, infrastructure, buildings and housing.





