Construction of Cat-II Structures and Internal Channels for Nuclear Power Plant
Karachi, Pakistan
Power & Energy
Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.
ALL POWER & ENERGY →- Location
- Karachi, Pakistan
- Client
- Pakistan Energy
- Main Contractor
- Habib Rafiq Engineering (Pvt.) Ltd.
- Contract Value
- (US$ 45 Million)
Scope
Scope of Work
- Construction of Category-II Building Structures
- Internal Channel
- Fall Structures, Culverts & Geotechnical Works
- Concrete: 75,000 M³
- Steel Works: 6,000 Tons
- Excavation: 482,000 M³
- Internal Channel: 2,800 Rm
- Stone Pitching: 20,000 m³
Source & verification
Documented from the official engineering portfolio.
The project name, location, client, contractor, contract value, covered area, and scope shown here are compiled from Habib Rafiq's published engineering record. This archive describes delivered portfolio work; it does not imply a current project status, open procurement, or investment offer. Request current documentation from HRL before relying on a record for commercial decisions.
VIEW SOURCE PORTFOLIO →Discuss a project with HRL.
Six decades of engineering delivery across power, infrastructure, buildings and housing.