Construction of Cat-II Structures and Internal Channels for Nuclear Power Plant
Karachi, Pakistan
Power & Energy
Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.
ALL POWER & ENERGY →- Location
- Karachi, Pakistan
- Client
- Pakistan Energy
- Main Contractor
- Habib Rafiq Engineering (Pvt.) Ltd.
- Contract Value
- (US$ 45 Million)
Scope
Scope of Work
- Construction of Category-II Building Structures
- Internal Channel
- Fall Structures, Culverts & Geotechnical Works
- Concrete: 75,000 M³
- Steel Works: 6,000 Tons
- Excavation: 482,000 M³
- Internal Channel: 2,800 Rm
- Stone Pitching: 20,000 m³
Discuss a project with HRL.