parco mid country oil refinery (100,000 BPD capacity)
Muzaffargarh
Chemicals & Petrochemicals
Delivered by Habib Rafiq (Pvt.) Ltd., a name trusted across Pakistan since 1962 for landmark infrastructure and engineering works.
ALL CHEMICALS & PETROCHEMICALS →- Location
- Muzaffargarh
- Client
- pak arab refinery co.(PARCO)
- Main Contractor
- JGC - japan.
- Contract Value
- US$ 132 million
Scope
Scope of Work
- Installation of firefighting sprinkle system at multiple locations including the product storage building Construction of Pedestal for pipeline
- Water drainage system for the entire plant, dike walls for fuel oil tanks, foundations for oil tank, Plant Roads involving asphaltic concrete equal to 200,000 Tons
- Oil tanks 4000 Tons of Steel Structure Fabrication and erection in less than 4 Months Complete HVAC, Electrical, Plumbing and mechanical works Detailed engineering fabrication, erection. 4”~20”=175,000 dia inches Design
- Largest Oil Refinery of Pakistan
Discuss a project with HRL.
Six decades of engineering delivery across power, infrastructure, buildings and housing.